During construction, Callon-Dietz established the new pipe location and tracked pipe usage, welds, and heat numbers. GPS and robotic total stations were used throughout this project. We worked closely with the construction crews to ensure that all necessary data was captured. Constructed drawings and a detailed pipe log were generated on completion.

The fast pace of this project demanded accurate, daily communication with the contractor and client.